Brooklyn Park Custom Bathrooms performs walk-in shower installation in Brooklyn Park, MN for residential bathrooms, commercial properties, and industrial facilities requiring easier access and efficient shower layouts. Our work covers shower base installation, low-threshold entry systems, wall surrounds, built-in niches, seating, grab-bar reinforcement, shower doors, and fixture placement using waterproof backer systems, moisture-resistant finishes, and durable plumbing components. Careful attention to floor slope, drain positioning, waterproofing transitions, enclosure dimensions, and water-supply connections helps create an accessible shower area with dependable drainage and practical day-to-day operation.
Brooklyn Park Custom Bathrooms adapts walk-in shower construction for single-family residences, apartments, hotels, offices, healthcare-related spaces, and workplace facilities based on occupancy and usage demands. We evaluate the existing floor structure, plumbing locations, available clearance, wall conditions, ventilation, and shower entry dimensions before establishing the installation approach. Proper coordination of these elements supports safer movement, effective water containment, easier cleaning, and a configuration suited to the property's specific requirements.
Brooklyn Park Custom Bathrooms plans each remodel around the home’s existing layout, plumbing access, ventilation, moisture exposure, and daily use. Our team keeps material selections, scheduling, scope changes, and installation details organized from the initial consultation through the final walkthrough.
Get a FREE Quote

Curbless walk-in shower installation creates a continuous entry between the bathroom floor and shower floor without a raised threshold at the opening. The shower base is constructed with a properly formed drainage slope, recessed subfloor assembly, waterproof membrane, cement backer board, and compatible drain system to manage water within the bathing area. Laser levels, digital measuring tools, straightedges, tile cutters, wet saws, notched trowels, and drain-setting tools are used to establish accurate elevations throughout the installation.
The shower floor is prepared to direct water toward a linear or centered drain while maintaining consistent transitions between the surrounding bathroom floor and wet area. Waterproofing extends across the shower floor, walls, corners, seams, curb-free entry, and plumbing penetrations using sheet membranes or liquid-applied waterproofing systems. Porcelain tile, ceramic tile, natural stone, thin-set mortar, grout, and flexible silicone sealant can then be installed over the prepared assembly.
The finished entry is coordinated with the shower door or open-glass configuration, bathroom flooring, drain position, and shower fixture placement. Glass panels may be secured with stainless-steel brackets or channels while maintaining the open access provided by the curbless design. This installation creates a continuous shower entrance with controlled drainage, sealed wet-area surfaces, and properly integrated bathroom finishes.

Custom walk-in shower base installation establishes a stable floor system specifically sized to the shower dimensions, drain location, and finished wall configuration. Shower bases can use prefabricated fiberglass or acrylic pans, solid-surface pans, tile-ready bases, or mortar-formed assemblies supported by appropriate waterproofing components. Measuring tapes, laser levels, drain tools, mixing equipment, trowels, levels, and cutting tools are used to position the base accurately within the bathroom.
The base is installed with the required slope toward the drain and supported across its contact area to minimize movement beneath the finished shower surface. Drain assemblies are fitted with compatible gaskets, flanges, strainers, and plumbing connections, while waterproofing is integrated with the surrounding wall membrane system. Wall substrates receive cement backer board or approved waterproof panels, with sealed corners and penetrations prepared before the final wall finish is applied.
Custom dimensions allow the shower floor to accommodate benches, niches, handheld sprays, multiple drain configurations, or specific bathroom wall conditions. The finished base is checked for level transitions at the entry and consistent drainage toward the outlet before surrounding tile or wall panels are completed. Proper base preparation provides a stable foundation for the shower enclosure, wall finish, fixtures, and remaining walk-in shower components.

Walk-in shower wall and tile installation creates durable vertical surfaces around the bathing area using waterproof substrates and bathroom-rated finish materials. Available finishes include porcelain tile, ceramic tile, natural stone, mosaic tile, large-format tile, waterproof wall panels, decorative borders, and coordinated trim profiles. Wet saws, diamond blades, tile cutters, laser levels, tile spacers, leveling clips, notched trowels, grout floats, and mixing paddles support precise cutting and surface installation.
Cement backer board or approved waterproof wall panels are secured to the shower framing before waterproof membrane systems are applied to seams, corners, niches, benches, and plumbing openings. Tile patterns are established from measured reference lines so grout joints remain aligned around shower valves, niches, shelves, benches, and enclosure edges. Thin-set mortar is applied with the appropriate trowel profile, while spacers or leveling systems maintain consistent joint widths and surface alignment.
Niches and recessed shelves are formed with waterproof construction before receiving the same tile assembly as the surrounding walls. Grout is packed into the prepared joints and cleaned to produce consistent finished lines, while silicone sealant is used at corners, changes of plane, and perimeter transitions where flexible joints are required. The completed wall system provides a continuous, moisture-resistant surface that coordinates with the walk-in shower floor and bathroom finishes.

Walk-in shower glass and fixture installation completes the enclosure and bathing components after the waterproof floor and wall assemblies have been prepared. Tempered safety glass, stainless-steel brackets, hinges, handles, channels, shower valves, handheld sprays, rain showerheads, and drain trim can be incorporated according to the selected shower configuration. Glass measuring tools, levels, squares, drills, anchors, fastening equipment, plumbing tools, and sealant applicators support accurate installation of each component.
Glass panels are measured against the finished shower opening before fabrication and positioned to maintain appropriate clearances from walls, floors, shower fixtures, and doorways. Hinged or sliding doors receive properly aligned hardware, while frameless panels use compatible brackets and supports to maintain stable positioning without unnecessary framing. Bathroom-grade silicone sealant and compatible gaskets are applied at designated enclosure connections to help control water migration around fixed panels and hardware.
Shower fixtures are positioned according to the planned plumbing locations, with valve trim, shower arms, handheld hoses, slide bars, and spray outlets aligned against the finished wall surfaces. Pressure-balancing or thermostatic controls are connected to the appropriate water supply configuration, while drain covers and other exposed plumbing components receive precise finishing. The completed walk-in shower combines secure glass construction, accurately positioned fixtures, controlled drainage, and finished waterproof transitions for a fully integrated bathing area.
The walk-in shower installation begins with a detailed assessment of the available bathroom area, existing shower or tub footprint, wall construction, floor elevation, drain location, and intended enclosure dimensions. Digital laser measures, laser levels, stud finders, moisture meters, and precision measuring tools are used to establish shower width, depth, entry clearance, wall height, fixture positions, and glass enclosure dimensions. The existing plumbing locations are documented so the shower valve, showerhead, handheld sprayer, drain, and other components can be coordinated with the planned walk-in configuration.
The shower layout is developed around an open entry design that provides sufficient passage space while maintaining practical locations for controls and water delivery. Specifications are established for the shower base or formed shower floor, porcelain or ceramic wall tile, cement backer board, waterproofing membrane, thin-set mortar, grout, silicone sealant, shower fixtures, and glass enclosure components. Wall niches, corner shelves, benches, grab bars, and other requested accessories are positioned according to the available wall structure and final shower dimensions.
Existing tubs, shower surrounds, tile assemblies, fixtures, and other designated components are removed to expose the underlying structure. Oscillating multi-tools, rotary hammers, pry bars, carbide blades, and dust-control equipment are used according to the material being dismantled. Plumbing connections are isolated before fixture removal, and adjacent flooring, walls, cabinetry, and other bathroom elements are protected against unnecessary damage.
The former tub or shower footprint is prepared for the new walk-in configuration after demolition is completed. Damaged framing is reinforced where necessary, while unsuitable drywall, backer board, or subfloor sections are replaced with materials appropriate for the new shower assembly. Cement backer board, corrosion-resistant screws, construction fasteners, and compatible joint treatments establish stable wall surfaces for the waterproofing and tile system.
The walk-in shower receives a continuous waterproofing assembly across the shower floor, walls, corners, niches, and plumbing penetrations. Sheet waterproofing membranes or compatible liquid-applied waterproofers are installed with reinforcing bands, preformed corners, pipe seals, and manufacturer-approved sealants at vulnerable junctions. The shower floor is formed with a controlled slope toward the drain to prevent standing water within the enclosure.
Porcelain or ceramic tile is installed over the waterproofed surfaces using compatible polymer-modified thin-set mortar. Notched trowels, tile spacers, leveling clips, laser levels, wet saws, diamond blades, and grout floats are used to maintain consistent joints, accurate cuts, proper tile coverage, and aligned wall courses. Floor tile is selected and installed according to the shower-floor application, while wall tile is coordinated with niches, benches, plumbing trim, and glass enclosure locations.
The open shower entry is finalized after the tiled surfaces and required sealants have properly cured. Tempered glass panels, fixed panels, channels, clamps, hinges, handles, or other enclosure hardware are selected according to the approved shower dimensions and installed with appropriate mounting systems. Accurate drilling and fastening methods are used to secure the glass hardware without compromising the waterproofed substrate.
Water flow and drainage are tested through the installed shower valve, showerhead, handheld sprayer, and drain assembly. The shower floor is observed for proper water movement toward the drain, while plumbing connections, trim plates, fixture penetrations, and sealant joints are checked for leaks or incomplete sealing. Glass alignment, door movement where applicable, hardware stability, tile joints, and enclosure clearances are also inspected.
We plan walk-in shower installations around the bathroom's available footprint, existing plumbing, drain position, wall structure, and desired entry configuration. The design can incorporate wider openings, low-profile shower bases, fixed or hinged glass panels, recessed niches, handheld shower systems, and strategically positioned controls. Each component is measured against the surrounding walls and floor to maintain practical movement while creating a defined shower area.
The shower footprint is established before construction begins to coordinate the shower base, drainage, waterproofing, wall finishes, and enclosure components. Existing tub or shower assemblies can be removed where necessary, with the underlying substrate inspected for damage, unevenness, or moisture-related deterioration before new construction proceeds. Cement backer board, approved wet-area substrates, waterproof membranes, and compatible sealants can be used to establish the shower's supporting assembly.
Walk-in shower entry also requires coordination with the surrounding bathroom floor. The threshold, shower base, drain position, finished floor height, and transition to the existing or new bathroom flooring are planned together to avoid unnecessary elevation conflicts. This detailed preparation allows the finished shower to provide an open entry while maintaining proper drainage and a controlled transition into the rest of the bathroom.
We install waterproofing components specifically for surfaces exposed to direct shower water, including wall corners, floor-to-wall intersections, plumbing penetrations, and shower-base connections. Waterproof membranes and compatible backer systems can be applied according to the selected shower construction method, with seams and penetrations treated to maintain continuity across the wet-area assembly. Proper waterproofing preparation is completed before finished tile or other wall coverings are installed.
Porcelain or ceramic tile can be selected for shower walls and floors based on the intended design, dimensions, surface characteristics, and maintenance requirements. Appropriate thin-set mortar, grout, flexible sealants, edge profiles, and transition materials are used according to the specific installation conditions. Accurate cuts around shower valves, drains, niches, corners, and plumbing penetrations help maintain consistent tile alignment throughout the enclosure.
The shower drainage system is coordinated with the floor configuration to direct water toward the drain without creating unnecessary standing-water areas. Shower bases, linear drains, point drains, and surrounding floor transitions can be incorporated according to the selected layout and construction conditions. Final sealant and transition details help establish clean connections between the shower floor, walls, enclosure, and adjacent bathroom surfaces.
We can incorporate practical features that improve movement and daily use within the walk-in shower. Handheld showerheads, pressure-balancing or thermostatic controls, recessed storage niches, corner shelves, seating, grab-bar reinforcement, and strategically positioned fixtures can be included according to the bathroom layout. Fixture positions are established before wall finishing so plumbing connections and mounting points correspond with the completed shower configuration.
Walk-in showers can also be designed to reduce unnecessary barriers around the shower entrance. Wider openings, low thresholds, clear glass panels, appropriately positioned controls, and carefully planned floor transitions can contribute to easier access. When grab bars or seating are included, structural reinforcement can be installed behind the finished wall to provide appropriate mounting support.
The finished shower is coordinated with the surrounding bathroom rather than treated as an isolated installation. Shower tile, grout, glass, hardware, flooring, vanity finishes, and other visible components can be selected to establish a consistent material and finish scheme. Precise measurements and controlled installation help ensure that the new walk-in shower fits the existing or remodeled bathroom without compromising surrounding fixtures or usable floor space.
Transform an outdated bathing area into a walk-in shower with an open entry, properly coordinated drainage, waterproof construction, durable finishes, and practical fixture placement. Brooklyn Park Custom Bathrooms can install shower bases, waterproofing systems, tile, drains, glass enclosures, niches, controls, and accessibility features according to your bathroom's dimensions. Contact us to plan a walk-in shower that improves access, simplifies cleaning, and makes better use of your available bathroom space.
Brooklyn Park Custom Bathrooms provides walk-in shower installation involving shower floors, walls, tile surfaces, drains, fixtures, corners, edges, and coordinated bathroom finishes. We plan the installation according to the available shower dimensions, surrounding walls, plumbing points, selected materials, and required clearances. Ceramic and porcelain tile can be incorporated for appropriate shower surfaces based on the selected design and application.
Yes, an existing bathtub area can be considered for conversion into a walk-in shower when the space and project conditions are suitable. The conversion requires consideration of available dimensions, plumbing locations, shower drainage, wall surfaces, floor conditions, and finished materials. These factors help establish the configuration and installation requirements for the new shower area.
Yes, we install ceramic and porcelain tile for walk-in shower walls and floors according to the selected application. Installation accounts for surface preparation, tile dimensions, grout joints, cuts, corners, edges, drains, and transitions. The tile layout is coordinated with shower fixtures and the surrounding bathroom surfaces.
Yes, updated shower fixtures can be incorporated into a walk-in shower installation according to the selected configuration. Fixture placement is coordinated with plumbing points, wall surfaces, tile layout, shower dimensions, and available clearance. This helps position the fixtures properly within the completed shower area.
Yes, moisture management is addressed during walk-in shower installation, particularly around shower walls, floors, corners, penetrations, and drain areas. Appropriate surface preparation is completed before the installation of tile or other finished materials. These details help protect the underlying surfaces from water exposure within the shower area.
© 2026 | Brooklyn Park Custom Bathrooms. All rights reserved.